
Epoxy Services
The most durable epoxy flooring system in Southern California.
Why US
Understand the difference...
Eco-Friendly
No harmful smell or eye burning, our process is dust-free and finished with ZERO VOC Polyurea Polyaspartic topcoats.
Fast And Efficient Service
Our flake systems floors are installed and dry the same day and can be lightly utilized 6 hours after installation.
Durable
Proved as the most durable 100% solids epoxy coating formula.
One Day Process
Learn the steps...
1.
Preparation
Profiling and opening the pour of the concrete using a planetary diamond grinding machine (dust free process)
2.
Cleaning
The entire floor will be vacuumed to remove any remaining dust and debris and to better expose the concrete imperfections.
3.
Repairs
Repairing any existing cracks or divots using a fast setting Polyurea or Polymer modified cement.
4.
Vertical Coating
5.
BASECOAT APPLICATION
6.
FLAKES BROADCASTING
To achieve a consistent look the vertical surfaces (stem-walls, stairs, or steps) will be rolled first separate from the floor.
Mixing and applying our 100% solid, two-component moisture mitigation epoxy base-coat.
After the basecoat is applied the crew will heavily broadcast the flakes for consistent 100% coverage.
7.
Scrapping And Vacuuming
When the basecoat is completely cured, the floor will be smooth-out by scrapping to knock down any standing flakes, and the access flakes will be vacuumed.
8.
Topcoat Application
Mixing and applying our two components VOC-free, odor-less, high-performance Polyurea Polyaspartic topcoat.